Capital Campaign - 2025

A capital campaign was started last year to address three areas of our campus. The playground, the covered walkway, and the office entrance. Read below on what each of these areas look to have done.

Playground Update

A major focus for this portion of the capital campaign is safety. Currently, our space is too small for the active play of our youngest members. Concrete pathways to trip on, metal poles of the covered walkway, and a swing just too close to a brick wall are all concerens.


To address these, we will expand the playground space all the way to the street sidewalk, remove and replace the covered walkway with a different path, and install an artificial ground covering that provided "fall protection".


New play equipment for a wider age of play and new swings will round out this area.

New Play Structure

Above is the new play structure that we will be installing. 

Office Entry

We will not be doing an work on the outside of the office entry but will be focusing on the inside.


The floors need to be redone, the walls need painting, and the ceiling needs replacement. 



Long overdue

Mismatched furniture round out the needs for this space. A major traffic zone during the week and on Sunday.